Before accessing Database Transmission Service (DTS), you may be concerned about its impact on source database data security and business operations. This topic answers key questions about data integrity, table-locking mechanisms, and resource usage:
Will the source database data be deleted or modified?
No.
- Read-only actions: DTS only executes SELECT read operations on the source end and will never write, update, or delete source database data.
- Data security: the migration process does not change any content in the source database, ensuring absolute safety of source end data.
Will tables be locked during migration?
No.
- Lock-free migration: DTS will not lock tables in the source database during the entire lifecycle of full migration and incremental synchronization.
- Business transparency: the source end's data tables always maintain normal read and write access, with very low business awareness.
Does incremental migration or synchronization affect business continuity?
No, it actually helps ensure continuity.
- Real-time synchronization: incremental migration captures and synchronizes source end change data in real time, allowing business to continue running on the source end during migration.
- Smooth switching: you can perform final cutover during off-peak hours, reducing downtime to minutes and minimizing business impact.
Can i manually end a migration task during a full migration?
Not recommended/not allowed.
- System managed: full migration tasks automatically flow and end by the system.
- Risk prompt: do not forcibly manually terminate tasks during full execution, as this likely causes incomplete or abnormal destination data states.
- Correct action: if termination is needed, wait for the full migration phase to complete automatically before stopping.
Will the pressure on the source database increase during migration? How to optimize?
During the full migration phase, data is mainly pulled through SELECT, which does cause certain I/O and network overhead. To reduce the impact on core business, the following measures are recommended:
- Off-peak execution: start the full migration task during business off-peak hours (such as late night).
- Rate limiting: adjust the full migration rate in Database Transmission Service (DTS) configuration to proactively limit read pressure on the source database.
- Resource isolation: ensure the source database has dedicated connections and bandwidth resources to avoid competing with core business for maximum bandwidth.